Senior PLC Programmer Call

Talk to a Senior PLC Engineer in Dallas-Fort Worth Before You Spend a Dollar

Local PLC programming and troubleshooting for Dallas-Fort Worth plants, with a free 30-minute planning call before you commit budget on Allen-Bradley, Siemens, or Schneider work.

Serving Dallas, Fort Worth, Plano, Frisco, Irving, Garland, Arlington & the entire DFW metroplex.

Jesse Lomas, senior PLC programmer at Jade Controls

Talk directly with: Jesse Lomas

Senior PLC programmer • 13+ years Allen-Bradley & Siemens projects in DFW

30-Minute Planning Call

Free no obligation

Book a 30-Minute PLC Planning Call

Or call now: (945) 941-7304 (Mon–Fri, 7a–5p CST)

Trusted by manufacturers across Dallas-Fort Worth

13+ years programming Allen-Bradley and Siemens for manufacturing, semiconductor, oil & gas, landfill gas, and wastewater plants

Dozens of PLC upgrade and migration projects completed across Texas

Vendor-agnostic opinions: we're not a Rockwell or Siemens shop

Book Your 30-Minute PLC Planning Call

Tell us about your plant, your platform, and what you're trying to decide. We'll give you a straight answer and a recommended next step. No cost, no obligation.

Useful call or we donate $100 to your plant's charity. If you don't leave with at least one new, actionable recommendation, we'll donate $100 to your plant's preferred charity. Your time is more valuable than ours.

Loading booking form...
Senior PLC programmer reviewing Allen-Bradley ControlLogix program in a Dallas plant

Bad PLC Decisions Are Expensive — and Hard to Undo.

A wrong platform pick, a poorly scoped quote, or a fragile rewrite can lock you into years of downtime and rework.

Undocumented logic

The engineer who wrote it left, and nobody else can safely change a tag.

Mystery downtime

The line keeps faulting and your team can't tell if it's the program, the wiring, or the field device.

An integrator quote you can't evaluate

Six figures, dozens of line items, and no way to know what's reasonable.

Guessing on PLCs is how plants lose weeks of production.

What You Get on the Call

30 focused minutes with a senior PLC programmer. No sales pitch, no platform loyalty — just an honest read on your situation.

Platform & scope check

Quick read on whether the platform, sizing, and architecture you're considering actually fit your process.

Vendor-agnostic opinion

We're not married to a single PLC brand. You'll hear what we'd actually do — not what we'd sell.

Quote sanity-check

Share an integrator quote and we'll flag what looks reasonable, what looks padded, and what's missing.

Troubleshooting starting points

Stuck on a fault, comms issue, or migration? You'll leave with 2-3 concrete next steps to try.

Migration & upgrade guidance

PLC-5 / SLC-500 to ControlLogix, Step 7 to TIA Portal — what to plan for and what trips most teams up.

Clear next step

If a deeper paid engagement makes sense, we'll scope it on the spot. If not, we'll say so.

How It Works

1

Book your 30-minute call

Tell us your platform, your process, and what you're trying to decide.

2

Short prep

Send us the quote, screenshots, fault codes, or program excerpts you want a read on.

3

The call

Talk directly with a senior PLC programmer — no SDR gatekeeping.

4

Clear next step

Concrete recommendations and, if useful, a scoped quote you can compare against.

Dallas PLC Programming Services — Frequently Asked Questions

Who is this consultation for?

Plant managers, maintenance leads, operations directors, and engineering teams in Dallas-Fort Worth who need a senior PLC programmer's outside opinion before committing to an integrator, upgrade, or new build.

What PLC platforms do you cover?

Allen-Bradley / Rockwell (ControlLogix, CompactLogix, MicroLogix, PLC-5, SLC-500), Siemens (S7-1200, S7-1500, S7-300/400, TIA Portal, Step 7), Schneider Electric (Modicon, EcoStruxure), and Wago. If you have a different platform, ask on the call.

Is the planning call free?

Yes. The 30-minute planning call is no cost and no obligation. If a deeper paid engagement makes sense after that, we'll scope it clearly before anything starts.

Will you sign an NDA?

Yes. We routinely sign NDAs before reviewing proprietary control logic, P&IDs, or process recipes. Send yours ahead of the call or use ours.

Can you help if my current integrator wrote the code?

Yes. We give vendor-agnostic opinions. You can take our recommendations back to your existing integrator, or we can quote the work directly — your call.

What areas of Dallas-Fort Worth do you serve?

Dallas, Fort Worth, Plano, Frisco, Irving, Garland, Arlington, Richardson, and the surrounding DFW metroplex. We also support remote engagements across Texas.

How fast can we get on a call?

Most planning calls happen within 1-2 business days of booking, scheduled around plant operations.

PLC Platforms We Cover

Decades of hands-on experience across the platforms most DFW plants actually run.

Allen-Bradley / Rockwell
Siemens
Schneider Electric
Wago
Modicon
Emerson / GE

Serving Dallas-Fort Worth

Local PLC programming consultancy serving manufacturers, processors, and utilities throughout the DFW metroplex and Texas.

Dallas, TX
Fort Worth, TX
Plano, TX
Frisco, TX
Irving, TX
Garland, TX
Arlington, TX
Richardson, TX

Don't see your city? We service the entire DFW metroplex and remote across Texas.

Prefer to Talk First?

Text or call us. We'll confirm your platform, your issue, and whether a 30-minute call is the right starting point.

Monday – Friday, 7:00 AM – 5:00 PM CST

30-minute planning call. Vendor-agnostic. Senior PLC engineer. No cost, no obligation.

Jade Controls

© 2026 Jade Controls. All rights reserved.